
On Wednesday, the Ecuadorian justice system ordered the ecological restoration of the area affected at El Murciélago Beach in Manta. Judge Ingrid Elizabeth Mera Tomalá, of the Manta Criminal Judicial Unit in the province of Manabí, maintained the suspension of the “Patio 600” port expansion project, having determined that the construction work violated the nature rights.
RELATED:
Ecuador’s Flood Emergency Deepens as El Niño Claims 14 Lives
The ruling partially granted a petition for constitutional protection—including a precautionary measure—filed by the Citizens’ Commission for the Defense of the Beach. The decision holds the Manta Port Terminal (TPM) and the Manta Port Authority (APM) responsible for the environmental impacts caused during the expansion work.
The “Patio 600” expansion involved development on three hectares of El Murciélago Beach, with an announced investment of $2.3 million. The project is part of a public-private partnership between the Ecuadorian state—represented by the APM—and the operator, TPM.
However, the Citizens’ Commission for the Defense of El Murciélago Beach reported that initial construction activities removed approximately 4,000 cubic meters of sand, damaging owl nests, resting grounds for migratory marine birds, and sea turtle nesting sites.
“Hoy gana la naturaleza, gana la ciudadanía y gana el derecho de las futuras generaciones a disfrutar de una playa viva y protegida”.
Con estas palabras, el doctor Trajano Andrade representante de la Comisión de Defensa de la Playa El Murciélago destacó la resolución pic.twitter.com/jWgoRo7Xsj— Radio Visión Manabí (@radiovisionmana) November 18, 2026
The text reads, ““Today, nature wins, the public wins, and the right of future generations to enjoy a vibrant, protected beach wins.” With these words, Dr. Trajano Andrade, representative of the Commission for the Defense of El Murciélago Beach, highlighted the resolution.”
The area is designated as a Conservation and Sustainable Use Area (ACUS), and civic groups argue that the intervention compromises a coastal space vital for biodiversity, tourism, and public use of the beach.
These factors led the judge to prohibit the resumption or continuation of the “Patio 600” expansion. Furthermore, the ruling mandates that the TPM fund the ecological restoration of the affected area, to be carried out by accredited professionals under the supervision of the relevant authorities.
The APM is tasked with ensuring compliance with the prohibition against continuing the construction work. Following the hearing, the group’s lawyer, Trajano Andrade, described the decision as a victory for the protection of the beach and the rights of nature recognized in the Ecuadorian Constitution.
#Ecuador | Former Vice President Jorge Glas alleges he was beaten and threatened inside El Encuentro prison. His defense disputes official records classifying the incident as self-harm.#JorgeGlas #HumanRights #PrisonAbuse #teleSUREnglish pic.twitter.com/hQ3mp44tdo
— teleSUR English (@telesurenglish) November 18, 2026
From teleSUR English via This RSS Feed.

