Construction of a power plant that will burn waste to generate electricity at a landfill near Bangladesh’s capital faces strong opposition from nearby communities, who say they fear severe health risks posed by toxic air pollution, reports contributor Eyamin Sajid for Mongabay. The $467 million project is being overseen by the municipal authority Dhaka North City Corporation, and is owned by the China Machinery Engineering Corporation (CMEC), backed by Chinese-headquartered multilateral lenders. It’s designed to incinerate up to 3,000 metric tons of municipal waste daily, tackling the capital’s escalating garbage crisis while also generating up to 42.5 megawatts of electricity. The project is slated for completion in December 2028. Densely populated communities, including several schools, sit less than a mile from the location of the power plant. Local farmers told Mongabay that unmanaged trash fires at the dumpsite already disrupt their work and well-being. “We can’t breathe when waste is burned in the dumping station,” said Md Naim, who grows rice and vegetables nearby. “Our nose closes with ashes, and we feel a headache from the smoke while working on the field.” According to the environmental impact assessment for the project, the incinerator will produce 74.8 metric tons of fly ash daily, enough to get airborne. An analysis by environmental groups indicates the plant will generate 73,576 metric tons of solid waste annually, along with 39.56 metric tons of toxic substances, including dioxins, furans, and heavy metals. “If the power plant is built and run regularly, local residents, especially children…This article was originally published on Mongabay
From Conservation news via This RSS Feed.


